- Joined
- Apr 9, 2024
- Messages
- 1,417
Iris Energy Limited has announced an increase in its power capacity at the Childress site in Texas from 600 megawatts (MW) to 750 MW. This expansion follows approval from the Electric Reliability Council of Texas (ERCOT) and an amended connection agreement with American Electric Power (AEP). Iris Energy Expands Texas Operations On Wednesday, Iris Energy […]
Source link
The post Bitcoin Miner Iris Energy Expands Power Capacity at Texas Data Center appeared first on Panther AI.
Continue reading...
Source link
The post Bitcoin Miner Iris Energy Expands Power Capacity at Texas Data Center appeared first on Panther AI.
Continue reading...